250 KVA 11KV Power Distribution Transformer
产品介绍:

Product Introduction

This 250 KVA transformer was delivered to Djibouti in 2015. the rated power of the transformer is 250 KVA. It is a Step-down transformer 11KV to 0.4KV, the primary voltage is 11kv, the secondary voltage is 400v. The transformer adopted copper wire as winding material,thus it have better mechanical strength and anti-short circuit ability than aluminum windings. Our 250 kVA Distribution Transformer was designed with advanced technology and adopts high quality material and components which result in reliable quality and long operation time.


SCOTECH ensure each one of our delivered transformers had passed the full acceptance test and we remains 0 fault rate record for more than 10 years so far, oil immersed power transformer is designed in accordance with IEC, ANSI and other major international standards.


Scope of Supply

Product: Oil Immersed distribution Transformer

Rated Power: Up to 5000 KVA

Primary Voltage: Up to 35 KV


Technical Specification

250 KVA transformer specification and load capacity.

Delivered to

Djibouti

Year

2015

Model

S11-250 KVA-11/0.4KV

Type

Oil Immersed Distribution Transformer

Standard

IEC60076

Rated Power

250 KVA

Frequency

50HZ

Phase

Three

Cooling Type

ONAN

Primary Voltage

11KV

Secondary Voltage

0.4KV

Winding Material

copper

Vector Group

Dyn11

Impedance

4%

Tap Changer

NLTC

Tapping Range

±2*2.5%

No Load Loss

0.4KW

On Load Loss

3.05KW

Accessories

Standard Configuration


250 KVA Transformer Gas Relay

file0001


What is a gas relay?

The transformer gas relay is a protective device installed on the top of oil-filled transformers. It performs two functions. It detects the slow accumulation of gases, providing an alarm after a given amount of gas has been collected. ... An incipient fault or developing fault, usually causes slow formation of gas.


Finished 250 KVA 11/0.4KV Transformer

file0002


Why tap changer is placed on high voltage side?

The tap changer is placed on high voltage side because:

1) The HV winding generally wound over LV winding hence it is easier to access the HV winding turns instead of LV winding.

2) Because of high voltage the current through the HV winding is less compared to LV windings, hence there is less “wear” on the tap changer contacts. Due this low current, in on load tap changer the changeover spark will be less.


Packing and Delivery

file0003


FAQ

1. How soon can you delivery the transformer?

It depends on the quantity and capacity of the transformer, normally within one month since the date drawing confirmed by buyer.

2. How long can you provide the quality warranty?

12 months since the date transformer operated.

3. What payment method do you accept?

T/T (wire transfer), L/C both accepted.


Hot Tags: 250 kva 11kv power distribution transformer, China, suppliers, manufacturers, factory, price, cost, specifications, for sale, power distribution transformer 50kva, Liquid dielectric transformer 11kv, Dyn11 11kv distribution transformer, 25kv 0 4kv step down transformer, Three phase 750 KVA transformer, 150kva power distribution transformer


发布时间:2024-07-03  阅读:100 次  【打印此页】

截屏,微信识别二维码

微信号:

(点击微信号复制,添加好友)

  打开微信