Product

Quality

Rectifier Transformer Prefabricated Substation Pad Mounted Transformer Power Transformer Distribution Transformer Dry Type Transformer
4 MVA 4000 KVA 33KV To 415V Power Distribution Transformer
产品介绍:

Product Introduction

This 4 MVA Transformer was delivered to South Africa in 2019. the rated power of the transformer is 4000 KVA. It is a Step-down transformer 33KV to 415V, the primary voltage is 33KV, the secondary voltage is 415V. We use copper as our winding material, Copper has the advantages of low resistivity and good ductility, can make the transformer transmit voltage better. Our 4 MVA transformer was designed with advanced technology and adopts high quality material and components which result in reliable quality and long operation time.


SCOTECH ensure each one of our delivered transformers had passed the full acceptance test and we remains 0 fault rate record for more than 10 years so far, oil immersed power transformer is designed in accordance with IEC, ANSI and other major international standards.


Scope of Supply

Product: Oil Immersed distribution Transformer

Rated Power: Up to 5000 KVA

Primary Voltage: Up to 35 KV


Technical Specification

4 MVA transformer data sheet and specifications.

Delivered to

South Africa

Year

2019

Model

S11-4 MVA-33/415V

Type

Oil Immersed Distribution Transformer

Standard

IEC60076

Rated Power

4 MVA

Frequency

50 HZ

Phase

Three

Cooling Type

ONAN

Primary Voltage

33 KV

Secondary Voltage

415 V

Winding Material

Copper

Vector Group

Dyn11

Impedance

7%

Tap Changer

NLTC

Tapping Range

±2*2.5%

No Load Loss

3.6 KW

On Load Loss

27 KW

Accessories

Standard Configuration

Remarks

N/A


4 MVA 33/0.415KV Transformer Manufacturing

1


Why coil is used in transformer?

The current through the coil magnetizes the iron, and the field of the magnetized material adds to the field produced by the wire. ... By providing a closed path for the magnetic field lines, this geometry minimizes the magnetic reluctance and produces the strongest magnetic field.


Finished 4 MVA 33/0.415KV Transformer

2


Packing and Delivery

3


Maintenance of transformer breather

1、Check whether the moisture absorber changes color. If it is pink, it means that the moisture absorber is affected by moisture and needs to be treated. If it does not change color for a long time, it may be that the sealing gasket of the moisture absorber has not been removed. 2. Check whether the oil level of the transformer in the moisture absorber is low and whether it is necessary to add oil or replace the transformer oil

3. Check whether the glass cover of moisture absorber is tightened

4. Clean the bottom cover of the moisture absorber regularly to prevent the blockage from affecting the normal breathing of the transformer


FAQ

1. Where is your main market?

We had exported our transformers to more than 30 countries in the world, our main market is Africa countries, South and North American countries, and Asia countries.

2. What certificate do you have?

We have KEMA, CESI, CTQC type test report for our transformers.

3. How long is your delivery time?

30 days after drawing confirmed by buyer for distribution transformers below 5000kva, bigger transformers depend on the capacity and components, normally 30-90days(with imported components)


Hot Tags: 4 mva 4000 kva 33kv to 415v power distribution transformer, China, suppliers, manufacturers, factory, price, cost, specifications, for sale, s11 three phase transformer 75kva, 7 5mva step down transformer, low loss distribution transformer 11kv, oil type transformer 315kva, Dual Primary Voltage transformer, 11kv to 0 4kv oil type transformer


发布时间:2024-07-03  阅读:135 次  【打印此页】

截屏,微信识别二维码

微信号:

(点击微信号复制,添加好友)

  打开微信